Hospital Central do Lubango, Angola
The installation of a KidsOR paediatric suite involves a team consisting of a Biomedical Engineer, artwork installer and lead installer. On this project I lead the installation, working closely with both the KidsOR team and hospital staff to complete the project. As the lead installer I was involved in the training and set up of medical equipment, handover with hospital staff and meeting the need of the KidsOR team on site.
This project was successfully complete in May 2024. The below picture captures the KidsOR team alongside the hospital director and surgical staff.